RFP Objective and Business Context
Procure PE stackable-crate molds via dual-sourcing to secure supply continuity and competitive pricing for retail logistics networks. PE material selection leverages excellent chemical resistance and cost efficiency; however, low stiffness (flexural modulus 0.6β1.4 GPa) requires wall-thickness optimization and ribbing strategy to meet stack-load requirements. Stacked two-plate mold construction doubles cavity count without additional clamping force, reducing per-unit tooling investment. Target mold lifespan: 1β2 million cycles. Establish parallel production readiness with two qualified suppliers, each capable of 80β120 second cycle times for 2β5 mm wall parts. RFP enforces material traceability, shrinkage validation (Β±0.3%), and dimensional consistency across both suppliers.