RFP Objective and Business Context
Establish procurement requirements for PC injection molds producing nestable retail baskets with wall thickness 1.5β2.5 mm and optical clarity for point-of-sale visibility. Define mold class (typically Class 101β102 for high-volume retail), expected cavity count, and production volume targets. Specify that mold must accommodate PC's narrow processing window (melt temperature 280β320Β°C) without gate hesitation or weld-line defects. Require supplier to validate flow characteristics around basket ribs and nesting features. Establish sample-first protocol: first 50 shots reserved for dimensional and optical inspection before production release. Clarify whether aesthetic requirements (gloss, transparency grade) drive secondary finishing or mold surface texture specifications.