RFP Objective and Business Context
Establish procurement terms for PC thin-wall crate molds (1.5–4 mm nominal walls) targeting outdoor retail applications. PC's 1.20 g/cm³ density and 2.3 GPa flexural modulus provide structural rigidity for stacked loads; however, mold shrinkage compensation (0.5–0.7%) and cooling-cycle management are critical to dimensional stability. This RFP mandates sample-first production: first articles must validate gate locations, packing pressure profiles (280–320°C melt temperature), and draft angles before full-scale tooling. Supplier must demonstrate moisture-control protocols (vacuum-sealed storage pre-molding) to prevent dimensional drift and stiffness loss in finished crates exposed to outdoor humidity.