RFP Objective and Business Context
Establish dual-source capacity for injection-molded PP cold-chain crates with thin-wall geometry (1.5β2.5 mm nominal) serving retail temperature-controlled logistics. PP's density of 0.90 g/cmΒ³ and excellent chemical resistance to sanitizers and refrigerants make it ideal; however, UV stabilizer packages are mandatory for outdoor storage exposure. Cycle times must achieve 45β65 seconds to support volume requirements. Mold cooling efficiency is critical: uniform turbulent flow around cavities and gate areas prevents temperature-induced shrinkage variation (target Β±0.3% across all cavities). Dual-sourcing mitigates supply disruption and enables competitive cost management through transparent capacity allocation and performance benchmarking.