RFP Objective and Business Context
Procure a dual-sourced PE stackable checkout-basket mold system capable of producing food-safe containers with wall thickness 2β5 mm and cycle times aligned to retail volume forecasts. PE's excellent chemical resistance and density 0.94β0.97 g/cmΒ³ reduce product weight, lowering logistics cost. Stacked two-plate mold construction doubles output without additional clamping force, critical for high-volume retail distribution. Specify dual-source suppliers to ensure supply continuity and competitive pricing. Define mold modular construction for air-ejection and cam-operated suction-cup removal into side chutes. Establish baseline geometry, runner layout, and gate locations to enable interchangeable production across suppliers.