RFP Objective and Business Context
Define the procurement objective: acquire a production-ready HDPE checkout basket mold capable of 2–5 mm wall thickness with outdoor-grade durability. Specify annual volume forecast, target part cost, and delivery timeline. HDPE's melt processing window (180–230°C) and density range (0.94–0.97 g/cm³) demand supplier familiarity with low-temperature cycling and post-consumer resin (PCR) compatibility for sustainability initiatives. Establish whether the mold will produce virgin or recycled-content HDPE baskets. Clarify gate location, cooling strategy, and ejection mechanism requirements for retail basket geometry. Document any secondary operations (printing, stacking lugs) that impact mold cavity design and cycle time expectations (typically 30–50 seconds for HDPE basket production).