RFP Objective and Business Context
Procure a multi-cavity injection mold for stackable retail chairs in HDPE, supporting 500Kβ2M annual units under framework agreement. HDPE's 0.94β0.97 g/cmΒ³ density and 2.0β3.0% shrinkage demand precision cavity design and thermal control. Chair molds require wall thickness 2β5 mm with balanced ejection to prevent warping. Mold base steel must be P-20 or H-13 per AISI standards. Establish cost per cavity, cycle time targets (45β70 sec), and multi-year supply commitments with performance rebates tied to scrap rates and on-time delivery.