RFP Objective and Business Context
Define procurement scope: multi-cavity HDPE chair molds (typically 8β16 cavities) for retail seating production under framework-agreement pricing. Establish baseline: HDPE melt temperature 180β230Β°C, part wall thickness 2β5 mm, shrinkage tolerance Β±2.0β3.0%, density 0.94β0.97 g/cmΒ³. Specify mold-base material (SAE 1030 or AISI-4130 steel) and cavity/core plates (P-20 or H-13 tool steel). Outline expected cycle times (45β90 seconds per shot), annual volume commitments, and quality gates. Clarify whether supplier provides post-consumer recycled HDPE (PCR) material compatibility testing or virgin resin only.