RFP Objective and Business Context
Establish a framework agreement with qualified PE injection mold suppliers capable of producing thin-wall household logistics molds (2–5 mm nominal wall). Objective is to secure predictable unit economics, consistent shrinkage control (±0.3% tolerance on 2.0–3.0% PE baseline), and cycle time stability across multiple production orders. PE's low stiffness (0.6–1.4 GPa flexural modulus) requires mold design precision to avoid gate-induced warping in thin sections. Supplier must demonstrate capability in processing PE at 180–230°C with melt-flow-rate (MFR) grade selection that balances flow for thin walls against impact retention. Framework agreement duration: 24–36 months, with quarterly volume forecasts and annual cost-down targets of 2–3%.