RFP Objective and Business Context
Procure a stackable-series PP logistics crate mold capable of 2Γ4 or 2Γ2 cavity stack configuration with modular center-section design. Target cycle time: 2.75β3.5 seconds per shot. PP material selection requires melt temperature control 220β280Β°C and UV stabilizer inclusion to prevent outdoor degradation. Mold must accommodate servo-motor-driven ejection and suction-cup removal systems without manual operator intervention (MO time = 0). Single-source supplier ensures design consistency, tooling continuity, and standardized maintenance protocols across production ramp-up and volume scaling phases.