RFP Objective and Business Context
Establish framework agreement for PP stackable crate molds with modular insert design to reduce tooling costs and accelerate delivery cycles. Supplier must deliver production-ready molds capable of 220–280°C processing with wall thickness 1.5–4 mm per ISO 1873 PP grades. Mold carriers require drag-chain or hanging-conveyor compatibility with toggle-clamp mounting. Stack-mold configuration must integrate air ejection and cam-operated actuators for automated product removal into collection chutes. Scope includes master unit die frames with interchangeable cavity inserts, reducing machine downtime and enabling rapid SKU changeovers. Framework term covers 24–36 months with defined call-off procedures, pricing bands by cavity count, and continuous improvement targets on cycle time and shrinkage consistency.