RFP Objective and Business Context
Establish dual-source supply of ABS thin-wall cold-chain crate molds (1.5–3 mm wall thickness) supporting high-volume, fast-cycle logistics operations. ABS material selection ensures dimensional stability (0.4–0.7% shrinkage tolerance) and moderate chemical resistance for refrigerated environments. Procurement targets cycle-time optimization and thermal stability under rapid injection conditions. Dual sourcing mitigates supply disruption while maintaining cost competitiveness. Mold class: production tooling with multi-cavity configuration. Success metrics: on-time delivery, first-article quality, and sub-60-second cycle time achievement. Supplier must demonstrate expertise in floating core design and optimized cooling-line architecture to manage heat load from short-cycle, thin-wall ABS production.