RFP Objective and Business Context
Establish dual-source supply for heavy-duty PE checkout baskets in logistics/retail environments. PE material selection prioritizes chemical resistance (detergent, fuel exposure) and impact durability over stiffness. Procurement targets mold cavitation for 500Kβ2M cycle lifetime, cycle time 45β90 seconds per part. Dual sourcing mitigates single-vendor risk and enables geographic load-balancing. Supplier must demonstrate PE processing expertise: melt temperature control 180β230Β°C, shrinkage compensation 2.0β3.0%, and wall thickness uniformity 2β5 mm to prevent warping and flex-fatigue. Cost-per-cavity and lead-time parity required between vendors.