RFP Objective and Business Context
Define mold scope: single-cavity or multi-cavity PE chair mold for logistics sector, targeting high-volume production with PE's 2.0β3.0% shrinkage allowance built into cavity geometry. Clarify part weight, seat/back geometry, and assembly requirements. PE's excellent chemical resistance suits warehouse environments; specify mold material grade (P20, NAK80) and cooling circuit design to handle PE's melt temperature range (180β230Β°C) and achieve target cycle time. State annual volume, lead time, and whether supplier provides first-article inspection (FAI) or process capability study (PCS) at no cost.