RFP Objective and Business Context
Procure a PP thin-wall basket mold (1.5–4 mm nominal wall) for logistics applications via sample-first validation. Baseline requirement: produce approved samples within two mold iterations before full production release. PP's low density (0.90 g/cm³) and excellent chemical resistance suit logistics baskets but require controlled melt temperature (220–280°C) and UV stabilizer verification. Supplier must demonstrate cavity filling uniformity across all basket sections, confirm shrinkage compensation within ±1.5–2.0%, and validate ejection without part deformation. Success metric: sample approval within 8 weeks, then transition to production tooling with zero rework.