RFP Objective and Business Context
Procurement scope: thin-wall PP storage molds for food-beverage containers, 1.5β4 mm nominal wall thickness, targeting injection cycles of 30β60 seconds. PP material selection driven by chemical resistance to acids/bases, lightweight density (0.90 g/cmΒ³), and cost efficiency for high-volume production. Mold must accommodate PP's 1.5β2.0% volumetric shrinkage and 220β280Β°C melt temperature processing window. Define production volume (cavitation count), annual demand, and multi-year commitment to enable tooling amortization. Specify food-contact compliance (FDA, EU 10/2011) and UV stabilizer requirements if outdoor storage exposure exists. Establish mold lifespan expectation and insert replacement intervals to align supplier quotation strategy.