RFP Objective and Business Context
Establish dual-source capacity for PP thin-wall stackable crate molds (1.5β4 mm wall) targeting food-beverage storage and logistics. PP's 0.90 g/cmΒ³ density and excellent acid/base chemical resistance meet FDA food-contact requirements. Dual sourcing reduces lead-time risk and enables 50%+ output increase via stacked two-mold construction without additional clamping force. Primary success criteria: achieve 1.5β2.0% shrinkage tolerance control, validate UV stabilizer package for outdoor crate use, and confirm cycle-time parity across suppliers. Budget allocation should account for mold-validation costs and first-article inspection of both cavity sets.