RFP Objective and Business Context
Procure a high-cavitation injection mold for PP household food-beverage containers with consistent wall thickness (1.5β4 mm nominal) and rapid cycle capability. PP's shrinkage range of 1.5β2.0% demands cavity compensation strategy; mold temperature control (60β100Β°C) is critical for dimensional stability and surface finish. Supplier must demonstrate experience with multi-cavity PP tooling (8+ cavities minimum) and food-contact compliance (FDA CFR 177.1520, EU 10/2011). Define target production volume (annual units), cycle time target (seconds), and acceptable scrap rate. Establish that mold supplier owns cavity design responsibility and validates shrinkage prediction against material data sheets for the specific PP grade selected.