RFP Objective and Business Context
Establish single-source supply of injection molds for stackable PP food-beverage crates for outdoor storage and distribution. Molds must produce crates with 1.5–4 mm wall thickness, withstand repeated stacking loads, and maintain dimensional stability across 1.5–2.0% PP shrinkage. Supplier must demonstrate experience with modular stack-mold construction for high-volume food-contact containers. PP's excellent acid/base resistance meets food-safety standards; however, UV degradation is critical—molds must enable consistent stabilizer dispersion during injection at 220–280°C melt temperature. Single-source model requires supplier capacity for design iteration, tooling validation, and ongoing production support across multiple cavity configurations.