RFP Objective and Business Context
Procure a production-ready HDPE cold-chain crate mold capable of 2β5 mm wall sections with integrated stacking ribs and drainage features. HDPE's 2.0β3.0% shrinkage tolerance and 0.94β0.97 g/cmΒ³ density enable tight dimensional control for nested crate stacking. Mold must withstand outdoor UV exposure and repeated thermal cycling (β20 to +60Β°C operational range). Sample-first approach requires first-article inspection (FAI) approval before full production release. Establish baseline cycle time targets (45β90 seconds per shot) and cavity pressure profiles to validate gate location and cooling circuit efficiency for large crate geometries.