RFP Objective and Business Context
Establish procurement criteria for injection-molded PE food-beverage basket molds capable of production volumes _____ units annually. PE material selection leverages low-viscosity flow properties (critical for thin-wall food containers), excellent chemical resistance to food oils and cleaning agents, and density 0.94β0.97 g/cmΒ³. Mold class must accommodate wall thickness 2β5 mm typical for food baskets, with flow length analysis per PE melt-temperature window (180β230Β°C) to validate filling pressure and cycle-time economics. Sample-first procurement gates validation before tooling commitment. Supplier must demonstrate process capability for PE shrinkage compensation (2.0β3.0%) and dimensional stability across production runs.