RFP Objective and Business Context
Establish framework agreement for multi-cavity thin-wall PP crate molds supporting consumer-goods logistics. Molds must deliver 1.5β4 mm wall sections with PP shrinkage controlled to 1.5β2.0% to maintain dimensional stack-nesting tolerance Β±0.5 mm. Baseline cycle time target: 45β60 seconds per shot. Supplier must demonstrate capability for sustained production volumes (minimum 500k shots annually) with documented process controls for melt temperature 220β280Β°C and cavity pressure validation. Framework covers tool design, first-article inspection (FAI), and 24-month warranty with post-launch support.