RFP Objective and Business Context
Procure two qualified mold suppliers for outdoor-grade polypropylene crates to mitigate supply risk and enable competitive cost management. Crates require robust structural integrity across 1.5β4 mm wall sections with minimal warping post-ejection. PP's 1.5β2.0% shrinkage demands precise cavity compensation and consistent mold temperature control at 50β80Β°C. Outdoor exposure mandates UV-stabilized resin compatibility and mold venting to prevent gas traps. Cycle times target 45β90 seconds depending on wall thickness. Both suppliers must demonstrate capability to hold Β±0.2 mm tolerances on critical stacking surfaces and demonstrate repeatability across 500,000+ shot validation runs. Dual sourcing ensures continuity and leverages competitive pricing while reducing single-supplier dependency.