RFP Objective and Business Context
Establish dual-source capability for ABS injection-molded heavy-duty crates meeting structural load and dimensional consistency requirements. Crate molds demand center-gate design with L/t ratio ≤200 to ensure uniform wall thickness (1.5–3 mm) and minimize sink marks. ABS processing window (melt temp 220–260°C) requires tight process control to achieve 0.4–0.7% shrinkage and maintain stackability performance. Dual sourcing mitigates supply risk while maintaining cost competitiveness. Suppliers must demonstrate capability in cycle-time optimization for high-volume production and validated material flow simulation for large cup-shaped geometries.