RFP Objective and Business Context
Establish procurement requirements for a high-cavitation PE injection mold producing outdoor storage crates. PE material selection prioritizes chemical resistance and lightweight design (density 0.94β0.97 g/cmΒ³) over rigid stiffness; mold must accommodate PE's 2.0β3.0% shrinkage and 180β230Β°C melt-temperature window. Define cavity count, part geometry, wall-thickness distribution (target 2β5 mm), and cycle-time targets (typically 30β60 sec for crate geometry). Specify mold class, cooling strategy, and gating topology to minimize flow-induced anisotropy and warping in thin-wall sections. Clarify post-consumer resin (PCR) compatibility if sustainability mandates apply, as recycled PE exhibits lower melt-flow consistency.