RFP Objective and Business Context
Procure a Class A production mold for HDPE cold-chain crates with outdoor-grade durability and sample-first validation. HDPE's melt temperature range of 180β230Β°C and 2.0β3.0% shrinkage require precise cavity design and cooling strategy. Crates must withstand repeated thermal cycling in refrigerated logistics without stress cracking. Specify wall thickness targets of 2β5 mm to balance structural rigidity (flexural modulus 0.8β1.5 GPa) with cycle-time economics. Supplier must demonstrate mold-filling simulation capability and low-temperature impact testing (HDPE advantage over PP). Sample-first approach requires prototype cavity validation before full-cavity tooling commitment, reducing market-entry risk and enabling design refinement.