RFP Objective and Business Context
Procure dual-source-qualified stackable HDPE checkout basket molds meeting consumer-goods retail standards. HDPE material selection delivers impact toughness below 0Β°C and chemical resistance critical for food-contact environments. Dual-sourcing strategy mitigates supply concentration risk. Stack-mold architecture with modular center-section design enables 2.75 s cycle times and air-ejection removal via suction cups. Mold class: A (high-volume, tight tolerances). Specify wall thickness 2β5 mm per structural load analysis. Require supplier capability for servomotor integration, rack-pinion actuation, and chute-drop systems. Establish baseline production at 500K+ annual units across two qualified molders.