RFP Objective and Business Context
Procure outdoor-grade PP checkout basket molds meeting retail durability and cost targets via framework agreement. PP material specification: melt temperature 220β280Β°C, density 0.90 g/cmΒ³, flexural modulus 1.1β1.6 GPa. Molds must produce baskets with wall thickness 1.5β4 mm, estimated cycle time 7 seconds, and shrinkage control within 1.5β2.0% tolerance. UV stabilizer package is non-negotiable for outdoor exposure. Supplier must demonstrate competency in stripper ring/plate ejection systems and gating design for thin-wall PP parts. Framework agreement establishes volume commitments, pricing bands, and technical governance over 24β36 months.