RFP Objective and Business Context
Procure a single-source, high-cavitation injection mold for HDPE consumer-goods chair production. HDPE's rigid structure (flexural modulus 0.8β1.5 GPa) and low-temperature toughness justify precision mold investment. Target production volume, cycle time per cavity, and annual shot count must align with mold base steel selection (SAE 1030 or AISI-4130) and cavity/core plate material (P-20 or H-13 steel). Define gate location strategy to manage HDPE's 2.0β3.0% shrinkage uniformly across multiple cavities. Establish single-source supplier responsibility for tool maintenance, cavity repair, and dimensional stability throughout contract term.