RFP Objective and Business Context
Establish procurement requirements for injection molds producing ABS cold-chain crates for agricultural cold-storage logistics. Heavy-duty crates must withstand repeated stacking loads, thermal cycling (β18Β°C to +5Β°C), and sanitization exposure. ABS material selection ensures dimensional stability (shrinkage 0.4β0.7%) and adequate chemical resistance to food-contact sanitizers. Define annual volume targets, crate cavity count per mold, and production cycle time expectations (typically 45β90 seconds for 1.5β3 mm wall sections). Scope includes tool steel cavity design, cooling channel optimization, and mold release surface treatment to minimize crate sticking and surface defects in high-volume runs.