RFP Objective and Business Context
Procure a PP thin-wall checkout basket mold (1.5β3 mm nominal wall) for agriculture retail environments. Basket must withstand acidic/alkaline produce residues, maintain dimensional stability across 1.5β2.0% PP shrinkage post-molding, and support sample-first validation before full tooling commitment. Mold class: production-grade, cavity count TBD, cycle time target β€45 seconds. Supplier must demonstrate fill-path analysis compliance (no red-zone cavities per CAE), melt temperature control 220β280Β°C, and UV-stabilizer material certification. Award decision gates on first-article inspection (FAI) sign-off and cost-per-piece benchmarking.