RFP Objective and Business Context
Procure injection molds for PE stackable agriculture baskets designed for outdoor field storage and transport. Baskets must withstand UV exposure, chemical fertilizer contact, and repeated stacking loads without creep or stress-whitening. PE material (melt temp 180β230Β°C, shrinkage 2.0β3.0%) enables cost-effective production of thin-walled containers (2β5 mm nominal) with excellent chemical resistance. Mold class: high-cavity (8β16 cavities typical), cycle time target 45β60 seconds. Define cavity count, gate design, cooling circuit topology, and ejection mechanisms upfront to lock cost and lead time.