RFP Objective and Business Context
Procure dual-sourced PE thin-wall backroom crate molds (2β4 mm nominal wall) for agricultural storage and logistics. PE's low stiffness (0.6β1.4 GPa flexural modulus) is offset by superior chemical resistance and impact toughness in outdoor/wet conditions. Mold must achieve cycle times β€45 sec, part weight 800β1200 g, and support stack loads up to 150 kg per unit. Establish two qualified suppliers to mitigate supply risk and drive cost competitiveness. Define acceptance criteria for shrinkage control (within Β±0.3% of nominal), gate draft angles, and rib geometry to ensure dimensional stability across production lots.