System Boundary and Scope Definition
PP storage-mold trial validation encompasses material qualification, mold geometry confirmation, and process-window establishment for food-contact containers. Scope includes PP resin selection (UV-stabilized grades for outdoor storage; high-melt-index 12β15 g/10min for thin-wall 1.5β2.5 mm designs), cavity layout validation at 1.5β2.0% shrinkage compensation, and thermal cycling simulation for retort-sterilization (121Β°C, 15β30 min cycles). Boundary excludes secondary operations and labeling but includes gate-location impact on shrinkage uniformity, cooling-time optimization to prevent warping, and chemical-resistance verification against target acids/bases. Cross-functional scope spans mold design, material procurement, process engineering, and regulatory documentation.