System Boundary and Scope Definition
PP agricultural storage mold tooling spans material specification (0.90 g/cmΒ³ density, 1.5β2.0% shrinkage), cavity design (1.5β4 mm walls), and process window definition (220β280Β°C melt temperature). Scope includes UV stabilizer type/loading coordination with resin supplier, gate location strategy to manage shrinkage gradients in large tanks, and cooling circuit design to prevent warping in thick sections. Exclude finished-goods handling; include mold qualification at minimum 1,000 shots to validate shrinkage repeatability. Cross-functional handoff: material engineering confirms stabilizer package; tooling confirms cavity tolerances Β±0.5 mm; process engineering locks melt temperature band and hold pressure profiles.