System Boundary and Scope Definition
Trial-validation scope for PP household molds spans resin receipt through first-article inspection and logistics sign-off. Define boundary at material lot acceptance: PP density 0.90 g/cm³ and melt-flow index must match baseline before molding begins. Tooling boundary includes cavity pressure mapping at 220–280°C melt temperature and gate-location validation against 1.5–2.0% shrinkage targets. Logistics boundary covers material staging, trial-run scheduling, dimensional hold-time verification (parts stabilize over 24–48 hours post-mold due to PP crystallization), and first-article packaging. Cross-functional sign-off requires tooling engineer, process technician, quality inspector, and logistics coordinator. Exclude secondary operations and assembly unless contractually bundled. Document baseline resin certificate-of-analysis and mold build-record as reference for all downstream changes.