System Boundary and Scope Definition
Define tooling scope by mapping PP part geometry, wall thickness (1.5–4 mm typical), and food-contact regulatory requirements (FDA, EU 10/2011). Establish shrinkage compensation targets: 1.5–2.0% for PP requires cavity offset calculations tied to part function—critical for household containers where dimensional stack-up affects sealing and stacking. Identify gate locations, cooling circuit topology, and venting strategy as shared responsibility between mold designer and resin supplier. Document melt temperature window (220–280°C) and cooling rate constraints to prevent warping in thin-wall sections. Clarify which party owns material certification, UV stabilizer specification (critical for outdoor household items), and post-mold deflashing/trimming processes. Define acceptance criteria: dimensional tolerance bands, surface finish (gloss/matte), and chemical resistance validation per food-contact standards.