System Boundary and Scope Definition
PP chair molds operate within a defined cost envelope: material cost ($0.04β$0.08 per 40 g unit), mold amortization, and cycle-time efficiency (10β15 s typical for chair components). System scope includes cavity count decisions, gate location impact on PP's 1.5β2.0% shrinkage tolerance, and logistics buffer for UV-stabilizer lead times. Boundary excludes post-molding finishing but includes in-mold assembly feasibility. PP's excellent chemical resistance eliminates coating risk, but UV degradation without stabilizer mandates supplier coordination on resin lot traceability. Mold cost absorption strategyβwhether customer or molder bears toolingβdrives inventory policy and payment terms alignment with production ramp.