System Boundary and Scope Definition
PE storage-mold procurement scope encompasses cavity design for 2–5 mm wall thickness, runner sizing to maintain 180–230°C melt coherence, and cooling-circuit layout to manage PE's 2.0–3.0% volumetric shrinkage across retail container geometries. Supplier responsibility includes dimensional hold at ±0.3 mm (post-shrinkage), gate-location optimization to minimize weld-line stress concentration in low-stiffness PE (flexural modulus 0.6–1.4 GPa), and thermal profiling data for each cavity zone. Cross-functional handoff points: design engineering validates shrinkage compensation; procurement confirms cooling-time SLAs; operations tracks mold-temperature stability. Exclude secondary finishing and assembly from mold-supplier scope unless explicitly contracted. Define material specification as virgin PE only (no regrind) to ensure consistent density 0.94–0.97 g/cm³ and chemical-resistance performance for retail storage applications.