System Boundary and Scope Definition
PE storage containers span rigid (HDPE) and flexible (LDPE) applications with distinct mold strategies. Scope includes cavity pressure profiling across 2–5 mm wall sections, gate location impact on shrinkage uniformity (2.0–3.0%), and cooling time optimization for density stabilization (0.94–0.97 g/cm³). Define material grade upfront—HDPE for stiff, stackable bins; LDPE for collapsible or flexible sidewalls. Establish baseline melt temperature band (180–230°C) and corresponding screw speed ranges to prevent thermal degradation. Identify critical dimensions requiring post-mold compensation and dimensional drift monitoring windows. Scope must include storage environment exposure (chemical resistance validation) and regulatory compliance (food contact, chemical compatibility). Cross-functional teams—design, tooling, process engineering, quality—must align on wall thickness distribution and draft angle requirements before tool steel selection.