System Boundary and Scope Definition
PE household-mold tooling strategy encompasses material flow from resin specification through cavity design, process parameter windows, and dimensional hold requirements. PE's 2.0–3.0% shrinkage range and density 0.94–0.97 g/cm³ establish the baseline for cavity compensation calculations. Typical wall thickness 2–5 mm constrains cooling time and gate location; retail applications (storage bins, food containers, protective padding) require chemical-resistance validation per PE's excellent resistance profile. Scope includes mold steel selection (P20 or H13), cooling circuit design to maintain 180–230°C melt temperature, and part geometry feedback loops. Cross-functional ownership: product engineering defines shrinkage targets; tooling confirms cavity offsets; procurement validates resin lot traceability; quality establishes first-article inspection (FAI) protocols tied to PE-specific dimensional drift thresholds.