System Boundary and Scope Definition
PE household-mold applications in agriculture span irrigation valves, cisterns, tanks, and lawn/garden equipment. System boundary includes mold design (gate location, cooling circuit), process parameters (180β230Β°C melt, hold pressure, cooling time), and material shrinkage compensation (2.0β3.0% for PE). Scope excludes high-stiffness requirements; PE's flexural modulus (0.6β1.4 GPa) limits thin-wall designs below 2 mm. Define wall thickness 2β5 mm baseline and chemical exposure (fertilizer, water, UV). Cross-functional inputs: design specifies wall thickness and dimensional tolerance stack-up; molding validates gate location and cooling adequacy; quality confirms shrinkage prediction and chemical compatibility. Supplier coordination ensures PE resin grade (LDPE vs HDPE density 0.94β0.97 g/cmΒ³) matches application pressure and chemical resistance requirements.