System Boundary and Scope Definition
Define mold scope by cavity count, gate location, and shrinkage target (2.0–3.0% for HDPE linear structure). Storage container walls typically 2–5 mm; thinner sections cool faster and shrink less; thicker sections retain heat and risk sink marks. Establish density tolerance band (0.94–0.97 g/cm³) tied to wall thickness and chemical resistance requirements. Map food-contact surfaces, closure interfaces, and stacking load zones. Clarify whether mold handles natural or recycled HDPE resin; recycled stock may have lower molecular weight, requiring tighter process control. Document cooling-time constraints: HDPE's low thermal conductivity demands extended cycle times relative to PP. Scope includes cavity pressure monitoring, thermal imaging during first-article inspection, and baseline shrinkage data collection across three production lots.