System Boundary and Scope Definition
Define scorecard scope to include HDPE-specific mold requirements: cavity wall thickness 2–5 mm, shrinkage compensation 2.0–3.0%, and cooling-time targets tied to part geometry and density 0.94–0.97 g/cm³. Establish material traceability linkage—virgin HDPE resin grade, MFI, and recycled content percentage—as procurement input. Scope includes mold steel selection (P20 or H13 for thermal cycling), gate location impact on weld-line strength in storage containers, and runner design for HDPE's lower viscosity at 180–230°C. Define end-use validation: chemical resistance testing per ASTM D543 for household and industrial storage products, impact testing at low temperature (HDPE's competitive advantage over PP), and dimensional stability post-mold release.