System Boundary and Scope Definition
Define mold scope as HDPE linear polyethylene (0.94β0.97 g/cmΒ³ density, minimal lateral branching) injection tooling for agricultural storage crates. Establish material specification window: melt temperature 180β230Β°C, shrinkage tolerance 2.0β3.0%, flexural modulus 0.8β1.5 GPa. Scope includes cavity design for 2β5 mm walls, gate location strategy to minimize weld lines, and cooling circuit sizing for cycle-time optimization. Boundary excludes secondary operations unless explicitly contracted. Document HDPE's superior low-temperature impact versus PP as design rationale. Cross-functional scope: procurement defines resin grade and supplier; mold engineering specifies cavity geometry and cooling; production owns process parameter lock.