System Boundary and Scope Definition
HDPE crate-mold selection encompasses material specification (melt 180β230Β°C, shrinkage 2.0β3.0%), mold cavity design tolerances, and logistics performance criteria. Define scope boundaries: resin grade selection (virgin vs. regrind blend), wall thickness (2β5 mm typical), and environmental conditions (cold-chain exposure where HDPE's low-temperature impact advantage over PP is critical). Establish whether crates undergo stacking loads, chemical exposure, or thermal cycling. Map cross-functional handoffs: procurement specifies resin properties; engineering designs cavity compensation; manufacturing validates process window; logistics validates dimensional stability and chemical resistance post-molding. Exclude secondary operations unless integrated into mold design (e.g., integral ribs, snap features). Clarify recycling streams and regrind incorporation limits affecting shrinkage predictability.