System Boundary and Scope Definition
ABS storage mold tooling scope encompasses cavity design, runner layout, and cooling circuit specification to manage 0.4β0.7% shrinkage within Β±0.1 mm retail tolerance bands. Wall thickness targets of 1.5β3 mm require runner balance and gate location optimization to minimize pressure drop across multicavity tooling. Density range 1.03β1.06 g/cmΒ³ influences cooling time prediction and cycle cost modeling. Scope includes mold flow simulation validation at 220β260Β°C melt window, thermal analysis of cooling channels, and ejection pin placement to prevent sink marks on visible surfaces. Procurement must define cavity count, cavity arrangement, and hot runner vs. cold runner economics. Material supplier coordination confirms ABS resin grade compatibility with mold surface finish and processing aids for storage box edge definition.