System Boundary and Scope Definition
ABS crate molds for food-beverage service operate within material and process constraints that directly impact tooling investment and production risk. System scope includes: cavity geometry tied to ABS shrinkage bands (0.4–0.7%), cooling channel layout for melt temperature control (220–260°C), gate location and runner balance, and ejection force limits. ABS density (1.03–1.06 g/cm³) and wall thickness range (1.5–3 mm) define cavity pressure profiles and pack-hold timing. Scope excludes post-mold assembly but includes dimensional hold gates at ±0.5 mm tolerance bands. Cross-functional handoffs span design engineering (shrinkage compensation), mold procurement (cooling performance), and production scheduling (thermal cycle stability). Supplier coordination covers material lot traceability and mold thermal imaging validation before first article release.