System Boundary and Scope Definition
ABS chair-mold trials must define material lot traceability, mold cavity layout, and process envelope boundaries. Scope includes: (1) mold thermal profile mapping at 220–260°C melt temperature across all cavities; (2) shrinkage compensation strategy for 0.4–0.7% ABS contraction, critical for chair seat/back dimensional stacks; (3) wall thickness validation at nominal 1.5–3 mm to prevent gate hesitation and weld-line weakness; (4) cooling-time targets tied to ABS's flexural modulus (2.1–2.8 GPa) for structural rigidity in load-bearing zones. Establish baseline material certificate requirements, gate location rationale, and acceptance criteria for first-article inspection before production trial begins.