System Boundary and Scope Definition
ABS chair-mold tooling scope encompasses melt-temperature control (220β260Β°C window), runner design for shear-layer stratification in amorphous ABS flow, and wall-thickness optimization (1.5β3 mm nominal). Food-beverage applications require chemical-resistance validation against target fluids and FDA compliance verification. Structural foam integration demands low-pressure IMM capability with programmable shot-size control. Shrinkage compensation (0.4β0.7%) must account for cooling-rate variation across chair geometry. Boundary includes mold cavity, cooling circuit, ejector pins, and gating topology. Cross-functional handoff points: procurement specifies ABS resin lot traceability; tooling engineering validates runner shear profiles; quality confirms dimensional tolerance stack-up (Β±0.5 mm typical for chairs) and chemical-resistance test results before production release.